Surveying the construction works
Surveying supports construction from excavation through tunnel works. Precision instruments help teams check positions and levels on site.


Year 2019-2023
Team experience includes work through previous employers.
Trafikverket is building a comprehensive infrastructure project in E4 to support the development in a rapidly growing Stockholm region.
Infinity Mätkonsult participated in the building of concrete tunnels, widenings, ponds, walls, asphalt works, to enable in the future the circulation of around 100,000 vehicles per day.
Surveying supports construction from excavation through tunnel works. Precision instruments help teams check positions and levels on site.


Road widening and excavation works require careful coordination around the existing road and temporary retaining structures.

The project included concrete tunnel works at different stages, from structural reinforcement to the construction of the tunnel lining.

Work around tunnel approaches and existing traffic calls for accurate measurements coordinated with ongoing construction activity.


The aerial view shows the scale of the excavation and the retaining structures used at the site.
Widening of the existing roads, two concrete tunnels (one on each side of the existing E20 road at the Förbifart connection), emergency exits, rock tunnels, rock wire cutting, comprehensive ground reinforcement work as sheet piles, curtain grouting, rock blasting, rock bolting, polluted soil excavation, sewage system and VA, bike trails.